Pfeiffertheface.com

Discover the world with our lifehacks

What time does the MTR start running?

What time does the MTR start running?

Timetable

First train Last train
Hong Kong 05:50 00:48
Kowloon 05:53 00:52
Tsing Yi 06:00 00:59

What new towns does the east rail line connect?

The East Rail Line provides comfortable, convenient and reliable travel experience to the passengers crossing the boundary to Shenzhen via Lo Wu and Lok Ma Chau stations. The two stations are directly connected to Luohu and Futian control points respectively.

What are the two main Colours on the car exterior of MLR trains?

The trains were converted to fixed 12-car sets and received a new exterior livery of blue and silverish bodies with red doors; they were reassembled into either a 3+3+6 configuration (3xx 2xx 6xx 4xx 2xx 6xx 6xx 2xx 5xx 5xx 2xx 1xx) or a 3+3+3+3 configuration (3xx 2xx 6xx 4xx 2xx 6xx 5xx 2xx 6xx 5xx 2xx 1xx).

What time is the first train for downtown line?

Downtown Line – (DT17) Downtown
Destination First Train Last Train
Weekdays & Sat Daily
DT1 Bukit Panjang 6:13am 12:16am
DT35 Expo 6:04am 12:06am

How will the new MTR R-Stock trains differ from the older trains?

The new MTR R-Stock trains will have wider compartments than the older East Rail line rolling stock, therefore narrowing the gap. Also, due to the planned decrease in train lengths from 12 cars to nine cars, trains will stop at less curved sections of the platforms.

Where can I find media related to the East Rail line?

Hong Kong: Hong Kong University Press. Wikimedia Commons has media related to East Rail line. Stations that are proposed, under planning or under construction are shown in italics.

What are the distance groups for the East Rail Line Cross Harbour?

There are 5 different distance groups for the “East Rail Line Cross Harbour Virtual Run”, including:46KM, 23KM, 18KM, 10KM and 5KM. Participants can decide your own route and complete the target distance specified by each group.

What’s happening to the East Rail Line platforms?

In addition, automatic platform gates are being installed on East Rail line platforms as part of the Sha Tin to Central Link project. These will block passengers’ view of the wide platform gaps.